Box build that delivers
finished products.

A tested board is not yet a product. We join boards, harnesses and enclosures, load firmware, run your acceptance tests and pack the result for your customer.

OVERVIEW

Integration decides
whether you ship on time

Full integration Functional test Turnkey delivery

Integration is where schedules often slip, because several vendors must agree. At Flashline EMS the whole flow, from PCBA to sub-assembly to integration to final product, happens under one roof.

That covers enclosure assembly, mechanical sub-assemblies, wiring and interconnect, board-to-board and module integration, labeling, final inspection and pack-out.

Because we made the boards, an issue found at integration goes straight back to the people who built them.

PCB Layout and Engineering Design
Electronic Circuit Design and Analysis
3D CAD Engineering Design
WHAT WE DO

What Box Build covers

PCBA and sub-assembly integration

Assemblies, modules and cabling are joined into working sub-systems, with board-to-board and module level integration handled in house.

Mechanical integration

Enclosure assembly, mechanical sub-assemblies and hardware integration, built to your drawings and work instructions.

Final assembly and firmware

System-level assembly with wiring and interconnect integration, followed by firmware loading and functional test.

Test and pack-out

Functional, burn-in and environmental testing, final inspection, labeling and identification, and pack-out support. The product ships ready to sell.

ALSO INCLUDED

Supporting capabilities

Taken from our capability sheet.

  • Production flow: PCBA to sub-assembly to integration to final product
  • Lot traceability and full process documentation
  • Process and final inspection at every production stage
  • Visual inspection and final verification
HOW IT RUNS

How Box Build works

Step 1

Plan

We agree build documents and the test plan.

Step 2

Integrate

Boards, sub-assemblies and enclosures are assembled.

Step 3

Load

Firmware is loaded and verified.

Step 4

Test

Functional, burn-in and environmental tests run.

Step 5

Ship

Your product is labeled, packed and delivered.

QUESTIONS

Box Build:
common questions

HEnclosures, cable harnesses, firmware loading, functional and environmental test, and packaging.

Yes. Sub-assembly and module integration are offered alongside complete products.

Full turnkey, partial turnkey and customer supplied models are all possible.

Lot traceability and full process documentation are maintained for every build.